AES AES

Fee Schedule

Effective July 1, 2007 Download in PDF format

Professional Services:
Senior Engineer/Geologist $150 /hr
Project Engineer/Geologist $125 /hr
Staff Engineer/Geologist $90 /hr
CAD Draftsman $75 /hr
Laboratory Technician $60 /hr
Office Services $50 /hr
Expert Witness $350 /hr, 4 hr. min.


Construction Observation - 2 hr. minimum*
Deputy Grading Inspector/Senior Field Engineer** $100 /hr
Senior Field Engineer $90 /hr
Field Technician $75 /hr
Periodic Field Observations - 2 hr. minimum***
Piles, Footings, Subdrains, Bottoms, Shoring
   Includes Mileage
$250 /hr   <40 mi radius
$280 /hr   60 mi radius
$320 /hr   80 mi radius


Miscellaneous
Copies of Reports $50 /copy
Oversize Drawings $50 min
Plan Review, Stamp & Signature $180 min
Mileage $0.65 /mile
Outside Services
   Backhoe, Drill Rig, Hand Labor, Lab Tests, Drawings
cost + 15%
Professional Opinion Reports, Prior-to-Purchase Evaulation Reports
   minimum charge per site
$950
Professional Consultation and Onsite Verbal Evaluation
   minimum charge per site
cost + $550

* $500 Deposit required to commence field observations.
** Dual Service- For the case where Soil Engineer also serves as Deputy Grading Inspector.
*** A $500 file review fee will apply when geotechnical report is prepared by another firm.

 

aessoil.com - Slope Stability, Soil Report, Geotechnical Engineering

 
©2007 Applied Earth Sciences
Site design by Zaklogic